bioRxiv Science⌕ Search

bioRxiv · 10.1101/2024.11.21.624694

Heterologous expression of critical pathway genes leads to complex pattern of increased yield of bioplastic precursors in Paraburkholderia sacchari ITP 101

Abstract

Recent research endeavors have turned to sustainably generating useful chemicals from biological platforms. However, conventional model organisms, such as Escherichia coli and Saccharomyces cerevisiae, face limitations, particularly in terms of substrate range and yield for certain metabolites. In this study, we share our work toward the development of the non-model bacterium, Paraburkholderia sacchari (hereafter P. sacchari), as a microbial factory for the production of polyhydroxyalkanoates (PHAs), which are precursors for biodegradable plastic. The particular PHAs of interest produced by P. sacchari include poly(3-hydroxybutyrate) (PHB) and the co-polymer produced by the combination of PHB and 3-hydroxyvalerate (3HV) called poly(3-hydroxybutyrate-co-3-hydroxyvalerate) (PHBV). P. sacchari produces PHB from mixtures of hexose and pentose sugars commonly found in lignocellulosic biomass, however PHBV requires co-feeding with propionate. Both plastic precursors have industrial interest, so both PHB and 3HV were chosen as production targets. Due to studies in other bacteria demonstrating PHB yield can be improved by overexpressing genes for critical pathway enzymes, we hypothesized there is a bottleneck in the production pathway leading to PHB in P. sacchari as well. To explore this, heterologous genes coding for the three critical enzymes were taken from Cupriavidus necator H16 (hereafter C. necator) and inserted via plasmid; phaA and bktb (homologous genes for {beta}-ketothiolase), phaB (acetyl-CoA reductase), and phaC (PHA polymerase). PHB production increased following overexpression of phaB, indicating acetoacetyl-CoA as the limiting enzyme. In fact, overexpression of phaB with the synthetic Anderson promoter, BBa_J23 104, increased titer by 162% over wildtype. On the other hand, strategies to improve 3HV had mixed results. Heterologous overexpression of propionyl-CoA transferase (pct from C. necator), which converts propionate into propionyl-CoA-the starting substrate for the 3HVproduction, showed a 145% increase in 3HV. Yet, internal sourcing of propionyl-CoA from succinyl-CoA following introduction of the sleeping beauty mutase (sbm) operon from E. coli showed no 3HV production. To this end, Max/Min Driving Force (MDF) thermodynamic analysis of critical PHBV pathways revealed two major limitations of 3HV production: 1) internal sourcing is not thermodynamically favorable; and 2) recycling of propionyl-CoA through the methyl citrate cycle (MCC) is more favorable than 3HV formation. Overall, we have shown promising progress and suggest future directions toward an industrially useful strain of P. sacchari for PHB and PHBV production. Graphical abstract O_FIG O_LINKSMALLFIG WIDTH=200 HEIGHT=71 SRC="FIGDIR/small/624694v1_ufig1.gif" ALT="Figure 1"> View larger version (20K): org.highwire.dtl.DTLVardef@1942ebaorg.highwire.dtl.DTLVardef@187ec83org.highwire.dtl.DTLVardef@b8b439org.highwire.dtl.DTLVardef@4015d6_HPS_FORMAT_FIGEXP M_FIG C_FIG HighlightsParaburkholderia sacchari has interest as a bioproduction platform for PHAs from complex feedstocks. Removal of PHA pathway bottleneck increases PHB yield by 162%. Improved conversion of fed-in propionate increases 3HV yield by 145%. Internal sourcing of propionyl-CoA does not successfully yield 3HV. Thermodynamic analysis provides insight into difficult conversion of propionyl-CoA to 3HV.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Morris, D., Chowdhury, N. B., Immethun, C., Saha, R.. 2024-11-22. Heterologous expression of critical pathway genes leads to complex pattern of increased yield of bioplastic precursors in Paraburkholderia sacchari ITP 101. https://doi.org/10.1101/2024.11.21.624694

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related preprints

SpiraMed: A Stereotactic Helix-based Therapy Delivery system for the Human Brain

Stereotactic needle-based delivery remains the standard for local administration of Advanced Therapy Medicinal Products (ATMPs) to the human brain. ATMP administration typically involves multiple trajectories, presenting cumulative risks and prolonging surgery. Reflux-prone, patchy therapy coverage compromises clinical results. We demonstrate a novel approach, deploying a helical delivery catheter via a single access trajectory per target, referred to as SpiraMed. Helix retraction is synchronised with therapy delivery, enabling comprehensive target coverage in seconds. Helix pitch and diameter can be precisely tailored to patient-specific target volume and vascular anatomy, as part of the preoperative stereotactic surgical planning process. Testing in agarose phantoms, live sheep and cadaveric human brain confirms enhanced therapy delivery volume, delivery speed and target coverage, with reductions in reflux and predicted risk of bleeding complication. SpiraMed represents a new paradigm, promising to help deliver on the transformative potential of cell and gene therapies across the spectrum of human CNS disease.

bioengineering↗

AtomWeaver: Multi-Component Flow Matching with a Structured Geometric Prior Facilitates Non-Canonical Peptide Design

Fixed-backbone sequence discovery, or inverse folding, is a critical recurring task in the development of new polypeptide therapeutics. Once promising backbones are established for a target pocket, computational inverse folding methods greatly help accelerate generation of candidate sequences. Such methods are mature for the traditional case of limiting to the fixed twenty-letter canonical vocabulary; however, they cannot access the broader space of non-canonical amino acids (NCAAs). This design constraint is exacerbated for peptide binders, a fast-growing modality that readily incorporates NCAAs, though in practice non-canonical design frequently depends on laborious medicinal-chemistry campaigns. An extension of inverse folding to NCAAs is thus critical to accelerating design of novel therapeutic peptides. AtomWeaver uses a joint all-site, atom-level generative scheme that does not restrict side-chain categorical assignment by either predetermined or co-resolving residue identity. Conditioned only on a fixed peptide backbone and its target protein, its multi-component flow guides side-chain atoms as unlabeled points in R3 from a nested shell prior to a variable-count final atom cloud. Identity is then read by matching each predicted cloud against a reference library of canonical and non-canonical templates. Since identity is decided only at decode time, the addressable vocabulary is a property of the library rather than of the trained weights: a new NCAA costs one reference structure and no retraining, and the model can select residues it was never prompted for and never saw in training. On a deep mutational scan of two peptide-target systems, AtomWeaver's canonical readout shows high observed mean agreement with experimental values among the compared inverse-folding methods. In the mixed canonical-noncanonical setting that canonical-only baselines cannot support at all, it likewise retains ranking signal across both systems. AtomWeaver also displayed self-consistent designs on de novo binder backbones, with the highest interface confidence among compared methods. Notably, it reached these metrics while achieving broad empirical coverage of our 300-residue vocabulary, including four non-canonical types never visible in training. AtomWeaver thus serves canonical and non-canonical peptide design alike, while transforming residue vocabulary to an expandable inference-time choice.

bioengineering↗

The Influence of Obesity and Body Shape on Sagittal Plane Knee Kinematics and Kinetics during Obstacle Crossing

Altered walking mechanics in individuals with obesity can contribute to knee osteoarthritis. The gait deviations may become more pronounced during obstacle crossing. In women, body fat distribution may further influence knee load, especially when excess fat accumulates in the thighs and hips. However, relatively little is known about how regional fat distribution affects gait in women with obesity. This study investigated how obesity and, among women, different fat distributions (Apple: more abdominal fat; Pear: more lower-limb fat) influence knee biomechanics during walking with and without obstacle crossing. Participants were 15 controls without obesity (NB) and 27 with obesity (OB). Within female participants, 10 without obesity (fNB) were compared with 20 with obesity, stratified by waist-hip ratio (Apple:10, Pear:10). Speed-adjusted statistical parametric mapping applied a general linear model (NB vs. OB) and an analysis of covariance (fNB vs. Apple vs. Pear). OB exhibited a significantly greater late-stance knee extension moment than NB across all tasks, and this difference persisted among fNB, Apple, and Pear in obstacle tasks (p<0.05). OB walked with reduced knee flexion during the early-stance leading limb after crossing a medium-height obstacle (p=0.048) and a high-height obstacle (p=0.008) compared to NB. There were significant body-shape effects (p<0.05), and post-hoc comparisons confirmed that Pear had lower knee angles than fNB in both leading-limb conditions after crossing medium- and high-height obstacles (p=0.008 and p=0.001, respectively). These findings suggest that obstacle crossing helps illuminate how excess weight influences knee biomechanics, and how regional fat distribution modulates the degree of this alteration.

bioengineering↗