bioRxiv Science⌕ Search

bioRxiv · 10.1101/2024.06.12.597770

A drug repurposing screen reveals dopamine signaling as a critical pathway underlying potential therapeutics for the rare disease DPAGT1-CDG

Abstract

DPAGT1-CDG is a Congenital Disorder of Glycosylation (CDG) that lacks effective therapies. It is caused by mutations in the gene DPAGT1 which encodes the first enzyme in N-linked glycosylation. We performed a drug repurposing screen on a model of DPAGT1-CDG in Drosophila ("DPAGT1 model") using 1,520 small molecules that are 98% FDA/EMA-approved. We identified 42 candidate drugs that improved the DPAGT1-CDG model. Notably from this screen, we found that pharmacological and genetic inhibition of the dopamine D2 receptor rescued the DPAGT1 model. Loss of both dopamine synthesis and recycling rescued the model, suggesting that dopaminergic flux and subsequent binding to D2 receptors is detrimental under DPAGT1 deficiency. This links dopamine signaling to N-glycosylation and represents a new potential therapeutic target for treating DPAGT1-CDG. We also genetically validate other top drug categories including acetylcholine-related drugs, COX inhibitors, and an inhibitor of NKCC1. These drugs and subsequent analyses reveal novel biology in DPAGT1 mechanisms, and they may represent new therapeutic options for DPAGT1-CDG.

Source connections

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Dalton, H. M., Young, N. J., Berman, A. R., Evans, H. D., Peterson, S. J., Patterson, K. A., Chow, C. Y.. 2024-06-12. A drug repurposing screen reveals dopamine signaling as a critical pathway underlying potential therapeutics for the rare disease DPAGT1-CDG. https://doi.org/10.1101/2024.06.12.597770

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related preprints

Synergistic Variants in C-terminal Binding Protein 1 and Alkaline Phosphatase Lead to Mandibular Hypoplasia Through Impaired Wnt Signaling: An Oligogenic Model

Craniofacial malformations account for one third of all congenital anomalies. Genetic factors play a vital role, yet the list of causal genes and their mechanisms are far from complete. As part of a larger effort to sequence patients with micrognathia and Pierre-Robin sequence, we identified two candidate pathogenic missense variants in C-terminal binding protein 1 (CTBP1) along with a heterozygous early stop missense variant in alkaline phosphatase (ALPL) in a proband with mandibular hypoplasia. Ctbp1 has been shown to regulate Wnt/{beta}-Catenin signaling but it has not yet been implicated in craniofacial development. Here we generated two orthologous variants of Ctbp1 mimicking the patient variants using genome editing in mice and explored the micrognathia phenotype in combination with a previously reported Alpl null allele. Ctbp1Q148H/G238S; Alplnull/Wt complex heterozygous mutants have smaller mandibles recapitulating the human mandibular hypoplasia. We identified that a reduction in cell proliferation and active {beta}-Catenin levels could possibly account for the micrognathia phenotype in the Ctbp1; Alpl complex heterozygous. These data uncover a novel role for Ctbp1 in craniofacial development and highlight the complex genetic and molecular signaling in the pathogenesis of craniofacial malformations.

genetics↗

Intergenerational instability of the C9orf72 hexanucleotide repeat

The C9orf72 hexanucleotide repeat expansion (HRE) is the most common cause of amyotrophic lateral sclerosis (ALS) and frontotemporal dementia (FTD). It follows autosomal dominant inheritance in families, however, a high proportion of cases are sporadic, raising the possibility of parental premutation. We have demonstrated that intermediate-length alleles (IAs) with >18 repeats (allele frequency ~1%) belong to the same pool of haplotypes as the HRE, suggesting shared ancestry. Here, we tested whether alleles with >18 repeats expand in parental transmission. We used two repeat-primed PCR methods to analyze allele lengths in 539 genetically unselected parent-offspring pairs and in 152 pairs known to carry the SNP (rs139185008*C) that tags >18 repeat IAs and the HRE in Finland. We discovered intergenerational repeat length changes only in >20 repeat alleles. A significant (P = 0.0059) sex bias in 6-40 repeat alleles was noted using a logistic regression model. In this allele range, 12 out of 16 expansions were paternally inherited and 6 out of 7 contractions were maternally inherited. The expansion rate of 20-40 repeat alleles was 34 % in paternal and 11 % in maternal transmissions. In the 20-40 repeat range, most intergenerational expansions were 1-4 repeats in size (15/16), but one larger jump, a paternal expansion from 27 to 73 repeats, was observed. These results demonstrate that alleles with >20 repeats have an increased likelihood of instability, that a paternal expansion bias is observed in alleles with 20-40 repeats, and that expansion events are predominantly 1-4 repeats in size.

genetics↗

Unravelling the role of IRX4 variants in non-syndromic and Down syndrome associated congenital heart disease

IRX4 is a TALE- homeodomain transcription factor which is essential for cardiac development. In murine models, Irx4 deficiency leads to impaired ventricular function and results in cardiomyopathy. To elucidate the role of IRX4 in human congenital heart disease (CHD), Sanger sequencing of the IRX4 gene was performed in 205 individuals with non-syndromic CHD, 24 Down syndrome (DS) cases with CHD, 27 DS cases without CHD, and 150 healthy control individuals. Two novel (p.Ser24Asn and p.Thr217Iso) and one reported variant (rs2232376) were identified in non-syndromic CHD. Concurrently, rs2232376 was also detected in DS with CHD. The first novel (p.Ser24Asn) and reported (rs2232376) variants lie in the N-terminal region while the second novel (Thr217Iso) variant lies within the TALE homeodomain. In silico structural modelling suggested that both the novel variants (p.Ser24Asn and Thr217Iso) induce conformational changes in the IRX4 protein, potentially altering its DNA-binding affinity. A significant reduced expression of IRX4 muteins was noted in Western blotting by both variants (p.Ser24Asn and Thr217Iso). Furthermore, luciferase reporter assays demonstrated decline in the activity of Nanog promoter and HEY2 enhancer in response to both the variants which was further corroborated by decrease mRNA expression in qRT-PCR. Additional downstream targets, including Nfyc, Nppa, and Bmp10, also exhibited anomalous expression due to both the variants (p.Ser24Asn and Thr217Iso). Altogether, the aberrant expression of muteins as well as downstream target genes along with compromised activities of promoters substantiate the pathogenic potential of the identified IRX4 variants and underscore the critical role of IRX4 in regulating multiple stages of cardiogenesis.

genetics↗